Land and buildings in Garve, purchased by the community as part of the GD CORe project
The validated version of the Garve and District Local Place Plan can be found on the Highland Council’s 'Local Place Plan' register: www.highland.gov.uk/localplaceplanregister.
Garve & District Local Place Plan Sept 2024 to Aug 2029
Acknowledgements
On behalf of our community, preparation of this Local Place Plan was facilitated by The Garve & District Development Company (TG&DDC) with valuable support from the Garve and District Community Council (GDCC).
Special thanks go out to the residents and local businesses who took time to engage with the process, without whom there would be no plan.
We also thank those communities who have paved the way in terms of sharing their Local Place Plans and learning - elements of which have informed the structure of this document.
Tina Hartley
Community Engagement and Development Officer
The Garve & District Development Company
1 September 2024

Contents
- Foreword
- Introduction
- Implementation
- Our Area
- Garve and District in Context
- Community Engagement
- Our Vision for the Future
- What’s Currently in Place and On-going
- Our Action Plan
- Statutory Land/Building Use Planning Policy Proposals
Figures
- National Planning Framework 4 – Spatial Strategy, Sustainable Places, Liveable Places, Productive Places Logos
- Linking Aspirations and Actions
- Delivery Partners
- National Standards of Community Engagement
- Local Place Plan – Timescale for Delivery
- Engagement Boards
- Community Priorities Moving Forward
- A Selection of Community Comments
Maps
- Garve & District Community Council Boundary
- Garve & District Villages
- Local Garve & District Facilities
- Community Land (The GD CORe)
- Garve & District War Memorial Land
- Wyvis Natural Playpark and Garve Access Track
- Garve Public Hall, Strathgarve Primary School, Garve Playpark, Burial Grounds, Football Area
- Kinlochluichart Church, Lochluichart Community Hall and Burial Grounds
- Achanalt Burial Grounds
- Achnasheen Pond, Village Hall and Public Toilet
- Silver Bridge Toilets
- Proposed Garve to Contin Path
- Garve to Gorstan Path
Appendices
- Precis -The GD CORe (The Garve & District Community Owned Resource) Options Appraisal and Business Plan (SKS Scotland, May 2023)
Foreword
Welcome to the Garve and District Local Place Plan.
This document represents a collaborative effort to envision and shape the future of our community. As we embark on this journey, we recognise the unique character, heritage, and natural beauty that defines our area.
The plan is more than just a blueprint; it’s a commitment to community well-being, sustainable development, and shared prosperity. Through active engagement, and a deep understanding of local needs, we aim to create a place where residents thrive, visitors feel welcome, and the environment flourishes. To achieve this, it is important that public bodies take note of the plan’s content and The Highland Council use it to inform their wider Highland Local Development Plan acknowledging the community’s views for development of land and buildings in our area.
In these pages, you will find aspirations that reflect our collective vision. We talk about Community, Place, Environment, and Infrastructure. Whether it’s caring for our community, enhancing public spaces, preserving our cultural heritage, or promoting economic diversification, every action outlined here contributes to a stronger, more resilient Garve and District.
We recognise that community needs change and although the plan will be registered in 2024 with The Highland Council, at an operational level it will be reviewed on an annual basis to ensure key community organisations - the Development Company, the Community Council and Lochluichart Community Trust (LCT) are representing the views and needs of our community. If you did not have the opportunity to respond to the
consultation then we encourage you to explore this plan and join us in shaping the future by sending us your views and comments.
Together, we can build a place that honours our past, embraces our present, and paves the way for generations to come.

The Garve & District Development Company SC565505
Introduction
The Garve & District Local Place Plan is a community-led plan setting out proposals for the development and use of land and buildings within our Community Council boundary. Introduced by the Town and Country Planning (Scotland) Act 1997 (the 1997 Act) as amended by the Planning (Scotland) Act 2019, the plan will set out our community’s aspirations for development over the next 5 years.
Our Mission
The Garve & District Development Company’s mission is to improve the social, cultural, economic, and environmental well-being of individuals and businesses by identifying and meeting community needs. We will create enterprise and projects, care for the environment, and promote the use of local resources, working with and for the local community, involving people, groups, and businesses.
Community Priorities
2024 saw the completion of our first Community Action Plan – What’s the Plan? Community Development 2019 – 2024. The plan was reviewed annually, and the final review celebrated how much had been achieved in terms of developing and moving forward community priorities. A number of new and on-going priorities are represented in this plan which will now be the document that guides community development moving forward. At a local level, it will support Lochluichart Community Trust in their allocation of community benefit funds and the Garve and District Community Council in their consideration of local planning applications.
Our Aspirations
Interestingly, our aspirations remain consistent with those previously identified and are a clear fit with local and national policy.
Photo 2: Ben Wyvis by Fenella Ross-Elmer
Being the richest man in the cemetery doesn't matter to me. Going to bed at night saying we've done something wonderful... that's what matters to me.
Steve Jobs, Apple founder
What is the plan for?
- To guide planning policy and decision-making, public services and investment by The Highland Council, Community Planning Partners, Scottish Government, and other public agencies
- To provide Garve and District Community Council with a point of reference to respond to planning applications
- To guide our own community action, including prioritising future spend by Lochluichart Community Trust and other funders
- To support funding bids, whether they are led by the local community or public bodies
Local and National Policy
Our Local Place Plan fits with both local and national policies. Of note is that the Garve and District Community Council Boundary is wholly covered by the Highland-wide Local Development Plan (The Highland Council, 2012) plus, it currently straddles two Local Development Plans’ areas:-
- West Highland and Islands Local Development Plan (The Highland Council, 2019)
- Inner Moray Firth Local Development Plan 2 (The Highland Council, 2024)
Our area also straddles three Highland Community Planning Partnership (HCPP) areas:
- Mid Ross Community Partnership and its two Local Plans
- Dingwall Locality Plan (2019) / Conon Bridge Locality Plan
- Skye, Lochalsh and West Ross Community Partnership / Easter Ross Community Partnership
In terms of national policies, at a community level the plan is in direct response to:-
- National Planning Framework 4 Delivery Programme (Scottish Government, 2023)
- National Planning Framework 4 (Scottish Government, 2023)
Reference to individual policies will be made throughout the document as appropriate.
Spatial Strategy
Sustainable Places
Liveable Places
Productive Places

Chilean volcano
Lorem ipsum dolor sit amet, ponderum dissentiet sed ea.
Fig 1: National Planning Framework 4 – Spatial Strategy, Sustainable Places, Liveable Places, Productive Places Logos
Implementation
The plan covers a 5-year period with the intention to review it at an operational level annually. Some community-led projects are on-going, and others are in the pipeline, but we may not see the results of these for a number of years. Figure 2 shows how the plan has been created and it is hoped that it will be taken into consideration and inform future local and national policy.
Delivering a successful plan will involve all stakeholders.
Our Area
Our community is represented by the Garve & District Community Council boundary and covers a rural area of 611 square km. We have a small population of around 250 residents dispersed over a large remote rural landscape.
Map 1 - showing the Garve & District Council Boundary
Our community is made up of five main areas situated alongside the two main roads, A832 and A835:
- Achnasheen & Achanalt (includes Ledgowan and Lochrosque)
- Lochluichart & Corriemoillie (includes Grudie and Fannich)
- Gorstan, Little Garve and Strathgarve
- Garve
- Silverbridge, Achnaclerach & Garbat, Inchbae, Aultguish, Blackbridge and Strathvaich
Map 2 - showing the community of Garve & District, defined within five distinct areas
Being the richest man in the cemetery doesn't matter to me. Going to bed at night saying we've done something wonderful... that's what matters to me.
Steve Jobs, Apple founder
Garve & District in Context
Garve sits along the Black Water River, 8km north west of Contin on the A835, the main road to Ullapool. It also benefits from having a train station which is serviced by the regular Kyle of Lochalsh service. The Blackwater River creates an attractive backdrop for the village, however there is also potential for flooding along the river and flood risk assessments may be required for some development. There is a rich built heritage with several Historic Environment Records in the local area, including Little Garve Bridge. There are several core paths around the area – Village River path, Silverbridge circuit, Tor Breac forest track and Kinellan to Strathgarve. The village benefits from a range of facilities including a village hall, small playing field, Wyvis Natural Play Park, food takeaway*, recycling point and a Primary School. Strathgarve Primary School has a low roll and is expected to decline further. The hotel has recently ceased trading however the community has aspirations for the site and it should continue to play an important role in the community.
Inner Moray Firth Local Development Plan 2 (The Highland Council, 2024)
*Food take away is no longer available
Our Community
Our remote and rural community is made up of around 250 residents, the July 2024 polling information told us that 230 of these were of voting age. There are 45 businesses known to us, the majority of which fall within the hospitality and construction/trades industries. Estates make up the next largest business group with those remaining falling into the following categories – creative, digital and technology and agriculture.
Approximately 40 volunteers, most of whom volunteer for more than one group, play a vital role within our community as do our community groups – Achnasheen Amenities Association, Friends of Garve & District War Memorial, Garve Events Group, Garve Public Hall Trustees, Green Leaves Group and Lochluichart Community Hall Committee.
We have 3 community organisations – Lochluichart Community Trust who are responsible for the administration of our local windfarm community benefit funds; The Garve & District Development Company who are responsible for moving forward the community’s wishes around community development and the Garve and District Community Council, a voluntary organisation set up by statute by The Highland Council and run by local residents to act on behalf of our area.
Our Places
Our community is made up of five main areas situated alongside the two main roads, the A832 and the A835: -
- Achnasheen & Achanalt (includes Ledgowan and Lochrosque)
- Lochluichart & Corriemoillie (includes Grudie and Fannich)
- Gorstan, Little Garve and Strathgarve
- Garve
- Silverbridge, Achnaclerach and Garbat, Inchbae, Aultguish, Blackbridge and Strathvaich
We have three assets owned by the community: -
- Community land (The GD CORe)
- Garve and District War Memorial
- Garve Public Hall
And one asset owned by the community but situated on land leased by Forestry and Land Scotland: -
- Wyvis Natural Playpark
Other community areas of importance to us are:-
- Achnasheen pond
- Achnasheen and Silverbridge public toilets
- Garve football area
- Garve playpark
- Old and new burial grounds at Garve and Achanalt
Our Environment
Our environment includes hills and mountains, lochs, rivers, forestry, crofts, and farms. Wind power has been developed central to Garve and District with two large commercial windfarms constructed in the last 15 years with 42 turbines currently installed and a further 22 turbines consented. Hydro-electric is also generated with several large dams, pipes, tunnels, and power stations all feeding into the Conon River Hydro system. The system was built in the 1950s and continues to supply the National Grid. The River Blackwater flows east from Glascarnoch down to Loch Garve, while the River Bran flows from Achnasheen down into Loch Luichart; both then leaving our area to join the Conon River and the Cromarty Firth. These are modified river systems due to management for hydro power generation. Forestry and Land Scotland manages much of the hillsides around Garve, Corriemoillie, and Longart with both commercial timber plantations and other areas dedicated to native species, river management and leisure activities.
Hill walking routes include several Munros within our area with access to Ben Wyvis, Beinn Dearg, The Fannichs and Fionn Bheinn. Several of these are areas of Special Scientific Interest or other environmental designation. There are lower-level walking and cycling routes along forest tracks between Inchbae, Silverbridge, Loch Garve and on to Contin. Scenic attractions include the river walk between Silverbridge and Wades Bridge which is adjacent to the Wyvis Natural Playpark and carparking and toilets at Silverbridge.
There are a number of traditional sporting estates within our area - Ledgowan, Lochrosque, Strathbran, Lochluichart, Fannich and Strathvaich. Red Deer stalking is an important part of land management on the hills but there is an increasing move towards woodland planting, renewable energy, and peatland restoration on the upland areas.
There are approximately 14 Crofts and Farms where livestock (cattle and sheep) are kept. Tourism is our main industry. Two hotels are currently offering accommodation, meals, and hospitality. A further two hotels are currently empty. Most other tourist accommodation are self-catering holiday cottages or Air BnB-type lets, probably about 20 in number. We have one cafe and three other smaller catering businesses. Staff shortages are reported in the hospitality sector locally. Self-employed and small businesses make up a significant sector in construction, groundworks, and trades as well as art and craft-based enterprises and home working via the internet.
Our Infrastructure
Most of our community lies along the two main roads that connect east to west. The A835 Trunk Road from Inverness goes through Garve, Inchbae, and Aultguish and on to Ullapool. In the wintertime this route can experience severe conditions. As a Trunk Road it is currently contracted to BEAR Scotland for maintenance.
The A832 to Achnasheen is our other main road and leaves the Trunk Road at the Gorstan Junction. The Highland Council has responsibility for this and also maintains minor roads serving Garve, Strathgarve, Little Garve, Gorstan, Lochluichart Station and Achnasheen.
The Kyle Line railway from Inverness to Kyle of Lochalsh runs through our boundary with stations at Garve, then request stops at Lochluichart and Achanalt, before coming to Achnasheen Station then leaving our boundary heading west to Kyle. There are bus services on both routes through our area to Dingwall and/or Inverness, or Ullapool, Gairloch and Lochcarron.
We have two separate mains water supplies, one serving the village of Achnasheen and the other serving Garve, Gorstan, Little Garve and Strathgarve. The remaining areas rely on private supplies. Many households have installed bore holes and some still have their own hill supplies, which can be less reliable during times of drought or extreme cold.
Strathgarve Primary School is the only remaining primary school within our area and most of Garve and District lies within the catchment area for Dingwall Academy.
Post Office services are available at Garve and Achnasheen.
NHS, GPs, and Pharmacies - these range from Strathpeffer and Dingwall to Raigmore, Invergordon and Lochcarron depending on the service and where you live in Garve and District. Social care is currently co-ordinated from Ullapool.
Church of Scotland holds regular services at Kinlochluichart Church, the only church within our boundary.
old and new burial grounds
church
community land
football pitch
hydro - community benefit
play area
pond
post office
primary school
public toilets
railway station
village / community hall
wind turbines - community benefit
Being the richest man in the cemetery doesn't matter to me. Going to bed at night saying we've done something wonderful... that's what matters to me.
Steve Jobs, Apple founder
Community Engagement
The Company had just undertaken the final review of the Community’s Action Plan during May 2024. This provided a clear indication of on-going community priorities:-
- Connecting Communities - Community Transport Service
- Caring for our community
- Traffic calming measures
- Improving home energy efficiency
- Community renewable energy
- Community land (The GD CORe)
- Groups and events
- Improved access to Garve and District War Memorial
- Supporting local businesses
- Developing/enhancing footpaths
These are therefore included in our Local Place Plan alongside other priorities identified during the recent engagement process.
Using The National Standards of Community Engagement we issued a community survey in paper, digital, and fillable pdf formats. The paper copy was sent to every household and business in Garve and District. We also held an open day at Garve Public Hall and invited our community to share their thoughts about land and building use alongside any other ideas they had around future community development. Directors and Officers of the Company also made themselves available for one-to-one meetings either face to face or on-line and encouraged contact via all our communication channels - letters, emails, comments on garve.org, our digital community hub, comments on social media and messages received via any social media platforms.
Timescale, Planning and Delivery
- Community Aspirations
May 24
Ask all for their views both online and via a community survey
- Shared Vision
June 24
Discussion sessions - in different formats. Main face-to-face session in Garve
- Draft Plan
July 2024
A draft plan will be developed from all comments received from all types of engagement
- Notice Period
August 2024
28 days for the community to comment. Plan will be available online and at key community events.
- Final Submission
September 2024
Finalised plan submitted to The Highland Council.
Fig 5: Local Place Plan – Timescale for Delivery
Alongside the community survey, engagement boards and question prompts were prepared for our face-to-face event.









Chilean volcano
Lorem ipsum dolor sit amet, ponderum dissentiet sed ea.
Fig 6: Engagement Boards









Chilean volcano
Lorem ipsum dolor sit amet, ponderum dissentiet sed ea.
Photos 3 – 10: Community Engagement Event June 24
Listening to our community
72 responses were received from an estimated 230 adults in the area. 380 comments were received on the subjects of Our Community, Our Places, Our Environment and Our Infrastructure

Our community placed their on-going projects in order of priority.On-going Projects
Fig 7: Community Priorities Moving Forward
Our vision for the future
Our vision for the future attempts to sum up comments received during the engagement process, all comments can be viewed via the individual Padlet links at the bottom of each section which are headed Our Community, Our Places, Our Environment and Our Infrastructure.
Our Community
- A community that cares for its residents and wherever possible funding opportunities are sought to support identified need
- A community with lots of activities and events for all ages
- A community that supports existing groups and promotes the development of new groups helping both to build capacity, to become self-sustaining and financially viable
- A community that promotes volunteering opportunities, avoiding volunteer fatigue and thinks creatively about how we achieve this within the limits of our small population
- A community that supports and promotes local business with a view to improving the economic landscape, job opportunities and services for residents
Our Places
- We want to preserve buildings and land that are important to us whilst identifying new opportunities for community development
- Community Land (The GD CORe) – we have identified how we would like to see the land used and developed
- Garve and District War Memorial – we will identify additional land to develop an all-ability access path and to extend the area where the memorial is currently sited
- We want to preserve our existing community spaces – community land (the GD CORe), Garve and District War Memorial, Wyvis Natural Playpark, Garve Public Hall, Strathgarve Primary School, Garve Playpark, Old and New Burial Grounds at Garve and Achnasheen, Garve Football Area, Kinlochluichart Church, Lochluichart Community Hall, Achnasheen Pond, Achnasheen and Silver Bridge Public Toilets
- We want The Highland Council to make a decision on what is going to happen with Achnasheen Village Hall. We may want a small community space in Achnasheen in
- the future
Our Environment
- Our environment is beautiful, and we want it to remain so
- Path Networks – we want to promote the existing path network whilst considering opportunities for new or enhanced paths in line with our Active Travel Plan
- We want our villages to be tidy and litter free, with flowers and welcome signage that identifies them as being part of Garve and District
- Mitigating flood risk is important to us. Important for safety and protection, economic resilience, environmental preservation and allows us to be prepared for the future as our climate changes
- We don’t want any more windfarms
- We do want community renewable energy projects and local projects such as wood fuel that bring real benefit to residents’ pockets
- We value traditional land management and livelihoods that crofting, farming, and estates bring to our landscape
- Our wildlife is important and should be protected
Our Infrastructure
- Traffic Calming – we want traffic calming measures where we need them and public agencies to acknowledge our lived experience
- Garve Hotel – we would like to see this building and land developed quickly
- Primary School – we want our children to continue to attend school in Garve. We want an improved learning environment including more indoor space
- Our Post Office services in Garve and Achnasheen are important, and we want to keep them
- Currently we are seeing a general trend towards the closure of remote rural community churches. Our church is important to its current congregation but is also an important historical feature within the community which we would hope to preserve
- Preserve and maintain our burial grounds at Garve and Achanalt
- Better infrastructure to support tourism is essential - public toilets, parking, and waste disposal for campervans
- Our roads need repairing!
- Parking is an issue
- Affordable housing is important to attract new, younger residents to the area
- Making our homes more energy efficient is important to us
- We are worried about our private water supplies and would like some help to upgrade them - bore holes for example
- Improved transport links both rail and bus services - we welcome the proposed new community transport service
- Health, well-being, and safety – easy access to NHS services and improved service provision is required, sheltered housing that is local, and better access to NHS Dentists. An improved Fire Service is essential for our remote community
What's currently in place and on-going
Our Community Residents, Community Groups, Volunteers, Businesses
Caring for our community is our highest priority. We currently have in place:-
- New Residents Welcome Pack
- Community Support Grants - available twice a year
- Activate Garve & District Project - free classes, workshops, activities, and events
- The Garve & District News - quarterly newspaper delivered to every household
- Office accommodation - free access to hot desking at Garve Public Hall for community residents
- Community printer - free access for community residents at Garve Public Hall
- Reduced hall hire for residents of Garve and District
- Two community electric bikes
- We manage a social media page where residents can share items they wish to sell or offer for free
Community Groups:-
- We have quite a number of existing groups who can all access support from our Community Engagement & Development Officer
- New Groups can access a “micro-grant” from Lochluichart Community Trust in support of set up costs. They can also ask for further funds from the Trust to support activities
- Any group can access the community printer for free and use the office at Garve Public Hall for hot desking or as a meeting room for free
- Groups can use garve.org to promote their services and share their events for free
- Groups can also advertise in The Garve and District News for free
Community Organisations:-
- The Garve & District Development Company – member led
- Garve and District Community Council – representing the whole community
- Lochluichart Community Trust – member led
Volunteers:-
We have a wealth of volunteers some are well known to us, and support more than one group and others work away silently in the
background.
Local Businesses (around 45): -
- We support our local eateries with attendance from our ladies’ lunch and men's brunch groups
- We run activities from local business venues
- Any business offering a service to Garve & District residents can advertise for free on our on-line community hub - garve.org
- Local businesses based in Garve and District can advertise their services for free in The Garve & District News
- We manage a social media page where businesses providing a service to Garve and District residents can advertise for free
Our Places Community Land (The GD CORe), Garve and District War Memorial, Community Facilities
Source: Parish Online
Community Land (The GD CORe) - the community owns a large piece of land formerly belonging to the Garve Hotel. Community engagement around development suggests:-
- Green space
- Riverside walks
- Public toilets
- Cafe
- Bike hire
- Grocery provision
- EV charging
- Parking facilities
- Workshops
A precis of the community engagement document based on SKS Scotland’s Final Report – The GD CORe (The Garve & District Community Owned Resource) Options Appraisal and Business Plan (May 2023) is attached at Appendix 1.
Garve and District War Memorial - we have been working with Forestry and Land Scotland to identify land surrounding the memorial for purchase. Map 5 identifies the current land owned by the community.
Community Facilities - we wish to retain and improve, where necessary, our existing community facilities:-
Source: Parish Online
Source: Parish Online
Source: Parish Online
Source: Parish Online
Source: Parish Online
Our Environment Welcoming Villages, New or Enhanced Path Network, Land Management, Agriculture
Welcoming Villages - we have community flower barrels around Garve and District. We have litter picking equipment available for volunteer use.
New or Enhanced Path Network - we have commissioned two concept designs. Garve to Contin and Garve to Gorstan Paths and work on next steps now needs to be considered. (See Maps 10 & 11)
Land Management – in the main, local estates and Forestry and Land Scotland professionally manage the larger areas of land within our boundary.
Agriculture – we have an active community of crofters and farmers.
Our InfrastructureTraffic Calming, Improved Transport Links, Energy Efficient Homes, Strathgarve Primary School, Kinlochluichart Church, Carparking, Tourist Infrastructure, Garve Hotel, Road Repairs, Garve and Achnasheen Post Offices, Health, Well-being, and Safety
Traffic Calming - is the second highest priority for our community. We currently have an active Travel Calming Group, and some progress has been made with planned gateway measures being agreed for parts of the A832.
Improved Transport Links - we have secured funding from a number of sources to run a new community transport project. The Connecting Communities Project is a joint initiative with Contin, Jamestown and Tarvie and aims to run a demand responsive service.
Energy Efficient Homes – This formed one of the themes of our now completed Community Energy Project and remains a priority. We are currently part of the Highland Community Energy Partnership; this is a community-based approach to implementing a step-change in energy advice and retrofit activity across the Highlands led by Changeworks. We are awaiting the results of a 5-year grant funding bid.
Strathgarve Primary School – the school is under threat of closure due to the state of the building and potential reducing school roll.
Garve and Achnasheen Post Offices – offers a regular service.
Kinlochluichart Church – Currently we are seeing a general trend towards the closure of remote rural community churches. Our church is important to its current congregation but is also an important historical feature within the community which we would hope to preserve.
Carparking - although a wonderful community initiative, visitors to Wyvis Natural Playpark do cause problems for us. Visitors tend not to use the correct access to the park, travelling through Garve village and Little Garve village with subsequent parking issues. Also, litter can be a problem. The community group responsible for the park are responsive to issues raised but in the longer term are hoping that the park can be managed by one of our larger community organisations.
Tourist Infrastructure - Achnasheen public toilets form part of one building owned by The Highland Council - Achnasheen Village Hall. The toilets are constantly being closed due to maintenance and repair issues. Other public toilets within our area are situated at Silverbridge. We currently have no facilities for campervan waste management within our area which means visitors are using public toilets to dispose of their chemical waste.
Garve Hotel - the hotel was last operational prior to Covid19 and sold in 2022. The building is in disrepair and causing concerns for local residents. Attempting to engage with owners has proved unsuccessful.
Road Repairs - We are grateful to the roads repair teams and have seen some improvements with the main roads running through our area, however like most communities in the Highlands, road repairs remain a key concern.
Health, Well-being, and Safety - in terms of promoting health and well-being we have run a number of initiatives in the past and currently run the Activate Garve and District Project. A project aimed at supporting new groups and providing activities to promote face to face connection. We provide a Community Support Grant to our more vulnerable residents who have also received free linked fire alarms and free installation.
Our Action Plan
Our Community
Goal
Improve the overall quality of life for our community, fostering a sense of well-being and connection
National Planning Framework 4
Spatial Strategy
National Performance Framework
Sustainable Development Goals
On-Going Community Priorities
- Caring for our community
- Community groups and volunteers
- Events and activities
- Supporting local businesses
Our Places
Goal
Preserve our existing community assets and take ownership of buildings and land that support community priorities, fostering a sense of place and identity.
National Planning Framework 4
Spatial Strategy
National Performance Framework
Sustainable Development Goals
On-Going Community Priorities
- Community Land (The GD CORe)
- Garve and District War Memorial
New Priorities
- Preserve buildings and land that have been identified and are important to us whilst identifying new opportunities for community development
- The Highland Council to make a decision and act quickly regarding the disposal Achnasheen Village Hall
Our Environment
Goal
Preserve our existing community assets and take ownership of buildings and land that support community priorities, fostering a sense of place and identity.
National Planning Framework 4
Spatial Strategy
National Performance Framework
Sustainable Development Goals
On-Going Community Priorities
- Community renewable energy
- Developing and enhancing footpaths
New Priorities
- Villages to be tidy and litter free, with flowers and welcome signage that identifies them as being part of Garve and District
- Mitigating flood risk
- No more commercial windfarms
- Traditional land management and livelihoods that crofting, farming, and estates bring to our landscape should be supported
- Wildlife is important and should be protected
Our Infrastructure
Goal
Improve the vitality of our infrastructure at a community level, working in partnership with public agencies.
National Planning Framework 4
Spatial Strategy
National Performance Framework
Sustainable Development Goals
On-Going Community Priorities
- Traffic calming measures
- Community Transport – Connecting Communities
- Improving home energy efficiency
New Priorities
- Garve Hotel – we would like to see this building and land developed quickly
- Strathgarve Primary School (old school building) – potential for community ownership of old school building to be explored
- Preserve and maintain our burial grounds in Garve and Achanalt
- Preserve Post Office services in Garve and Achnasheen
- Kinlochluichart Church – support continued services and preservation of building
- Improve infrastructure to support tourism - public toilets, parking, and waste disposal for campervans
- Increase schedule maintenance and repairs of road network
- Improved parking throughout Garve and District
- Improve visitor support facilities at Wyvis Natural Playpark
- Improve timetables for local trains and buses to support travel and return from work
- Improve NHS provision and Fire Service
- Affordable housing
- Private water supplies – improve supplies
Statutory Land/Building Use Planning Policy Proposals
The following proposals have been identified through community engagement “as being of particular significance to the local area”
Planning Circular 1/2022 Scottish Government
January 2022
Highland Local Development Plan
The proposed 2027 Highland Local Development Plan should make reference to Garve and District as a whole in recognition of our Community Council Boundary.
Updates to Existing Plans
The Inner Moray Firth Local Development Plan 2 provides some place information for Garve. It should be noted that food take away is no longer situated outside of Garve Public Hall.
Our Places
| Proposal | Reason |
|---|---|
| Develop Community Land (The GD CORe) |
|
| Provide an all-ability access path to and extend the site of Garve and District War Memorial |
|
| Garve Football Area |
|
| Achnasheen Pond |
|
Our Environment
| Proposal | Reason |
|---|---|
| Preserve our land and natural environment |
|
| New and Enhanced Footpath Network |
|
| Tidy and Litter Free Villages |
|
| Mitigating Flood Risk |
|
| No More Commercial Windfarms |
|
| Community Renewable Energy |
|
| Crofting and Agriculture |
|
Our Infrastructure
| Proposal | Reason |
|---|---|
| Introduction of new Traffic Calming Measures |
|
| Community Transport |
|
| Improving home energy efficiency |
|
| Development of Garve Hotel and remaining land that complements the community’s wishes for moving forward plans for their own land asset |
|
| Strathgarve Primary School |
|
| Garve and Achanalt Burial Grounds |
|
| Remote Post Office Services |
|
| Kinlochluichart Church |
|
| Improve tourism infrastructure – public toilets, campervan waste disposal, carparking |
|
| New and improved parking facilities |
|
| Affordable Housing |
|
| Private Water Supplies | To improve critical infrastructure |
Appendix 1

The GD CORe
Phase 2 Community Engagement 2023
Community engagement document based on SKS Scotland’s Final Report – “The GD CORe (The Garve & District Community Owned Resource) Options Appraisal
and Business Plan (May 2023)”
Contents
- Introduction
- Community Consultation
- Identified Key Outputs and Outcomes
- Operational Appraisal
- Estimated Early-Stage Capital Costs
- Estimated Early-Stage Income and Expenditure
- Next Steps
- The GD CORe Masterplan
Images
- Option 1: Retrofit – Proposed Elevations
- Option 1: Retrofit – Proposed 3D Views
- Option 1: Retrofit – Proposed Floor Plans
- Option 2a: New Build – Proposed Elevations
- Option 2a: New Build Proposed 3D Views
- Option 2a: New Build – Proposed Floor Plans
- Option 1: Retrofit – Sketch Image
Note: SKS Original Document - The Board systematically reviewed each section of the document and made amendments to minor omissions or errors, added wording to enhance meaning and deleted sections which were felt a duplication of information presented. The original document is available to any member of our community who wishes to read it.
Introduction
The content of this document is taken from – “The GD CORe Garve & District Community Owned Resource Options Appraisal and Business Plan” (SKS Scotland May 2023). Its aim is to provide a reader friendly version for members of our community who may not wish to read the full report from SKS. However, the full version is available to all.
The Garve & District Development Company (TG&DDC), following acquisition of land and accommodation block formerly belonging to Garve Hotel, issued a tender for services that would assist the community to consider potential options for land development. SKS Scotland were the appointed consultants.
Their role was to consult with the community to identify priorities for land development and then present an initial “masterplan” to aid further community engagement. Ultimately, this would enable SKS Scotland to move through an options appraisal process leading to the production of a business case that would reflect concepts based on community feedback to date for The GD CORe.
Consideration was given to the best use of assets and resources which has led to an ambitious, flexible, and sustainable suggested route forward for the site. The idea is to develop an existing under-utilised space to create new facilities for our local community and visitors to the area. Working in collaboration with Garve Public Hall it will also complement plans for the hall’s refurbishment and future offering, ensuring that both community assets fully meet identified community needs.
Community Consultation
A survey carried out in June 2022, received 105 responses (approximately 1/3 of the Garve and District population). 92% of respondents were supportive of the proposed redevelopment of the site for the benefit of the community. Retail opportunities (local produce, vending machines with basic provisions) a cafe or takeaway, outdoor walking/cycling activities, workspace, well-being space and public toilets were identified as priorities. Other clear indications from the survey were the desire for EV chargers and solar panels, space for a community marquee, parking for residents and visitors and more information on local walks and cycle trails.
Feedback was used to develop an initial masterplan for The GD CORe site and further drop-in sessions were held in August 2022, to refine thinking. On-going discussions regarding the type of build (retrofit or new build) to be pursued were held with the Company. These were informed by a building survey carried out in January 2023, which indicated that both options would be possible, and this has resulted in the ideas now being put forward to the community for further consideration.
These are by no means final plans but are concepts put forward to further community engagement.
Identified Key Outputs and Outcomes
Community consultation has identified the following: -
Outputs
- Flexible indoor and outdoor community and visitor spaces, which can be used for local activities, events, and gatherings
- Parking for locals and visitors including EV chargers and cycle park
- Accessible public toilets
- Well-insulated, energy efficient building(s) to house facilities
- Workspace
- Well-being Space
- Takeaway Café
- TG&DDC office – this could be a shared office for all three community organisations
- Cycle hire space
- Vending machine for local/essential produce
- Retail outlet pods for local hire
- Range of information resources and infrastructure to support walking and cycling
Outcomes
- Contribute to the local economy through small business activity
- Employment opportunities
- Support and enhance community cohesion, capacity, and wellbeing
- Support and enhance active travel
- Improve the visitor experience
- Contribute towards climate change mitigation, adaptation, and net zero ambitions
Options Appraisal
A survey of the existing accommodation building established that retrofitting to achieve the required facilities is an option. Therefore, two design ideas have been produced for further community consideration:
- Renovation and retrofit of the existing accommodation block with a small extension to support identified community priorities
- One, or two new single storey building(s) on the site to support community priorities
ESTIMATED Early-Stage Capital Costs
| External | Cost | VAT @ 20% | Total Cost |
|---|---|---|---|
| Ground Work | £684,580 | £136,916 | £821,495 |
| Option 1 - Retro-fit | Cost | VAT @ 20% | Total Cost |
|---|---|---|---|
| Accommodation Block | £868,785 | £173,757 | £1,042,543 |
| Option 2 - New Build | Cost | VAT @ 20% | Total Cost |
|---|---|---|---|
| a. On existing accommodation block site | £898,104 | £179,621 | £1,077,725 |
| b. Additional building – a. plus b. will provide similar floor space to retro-fit option | £111,320 | £22,264 | £133,584 |
| Total Option 2a and 2b | £1,009,424 | £201,885 | £1,211,309 |
| External Work + Option 1 Retro-fit | Cost | VAT @ 20% | Total Cost |
|---|---|---|---|
| £1,553,365 | £310,673 | £1,864,038 |
| Cost | VAT @ 20% | Total Cost | |
|---|---|---|---|
| External Work + Option 2a New Build | £1,582,684 | £316,537 | £1,899,221 |
| Total External Work + Options 2a and 2b | £1,694,004 | £338,801 | £2,032,805 |
Note: TG&DDC have sought advice on VAT implications for all options. VAT will be based on service provision which, based on what the community has put forward in terms of ideas, would not be VAT exempt. Costs associated with a retrofit and new build are therefore comparative.
Estimated feasibility costs were prepared by NBM Construction Costs Consultants based on the masterplan presented to the community for further consideration.
A phased approach could be taken to delivering the project depending on available funding opportunities.
ESTIMATED Early-Stage Income and Expenditure
From Year One The GD CORe Operation
| Income early estimates - Annual Income | Yr1 | Yr2 | Yr3 | Yr4 | Yr5 |
|---|---|---|---|---|---|
| Income for use of toilets - annual donations estimate | £8,057 | £8,299 | £8,548 | £8,804 | £9,068 |
| Advertising income/ sponsorship from local business | £3,000 | £3,090 | £3,183 | £3,278 | £3,377 |
| Lease for catering unit (see café lease estimates tab) | £3,000 | £3,600 | £4,500 | £4,500 | £4,500 |
| Electricity use payment from catering company (estimate included in café overheads) | £1,500 | £1,545 | £1,591 | £1,639 | £1,688 |
| Site hire for retail pods / pitches for marquees (early estimate) | £6,000 | £6,180 | £6,365 | £6,556 | £6,753 |
| Vending machine profit for CORe (estimate) | £4,008 | £4,128 | £4,252 | £4,380 | £4,511 |
| Cycle hire kiosk / desk rental annually (if not fully allocated to TG&DCC) | £1,200 | £1,236 | £1,273 | £1,311 | £1,351 |
| Total estimated annual income | £26,765 | £28,078 | £29,712 | £30,469 | £31,248 |
| Expenditure early estimates - Annual expenditure | Yr1 | Yr2 | Yr3 | Yr4 | Yr5 |
|---|---|---|---|---|---|
| 2 x 2 days per week caretakers, year round including maintenance and site rentals etc | £9,000 | £9,270 | £9,548 | £9,835 | £10,130 |
| Oncosts @12% | £1,080 | £1,112 | £1,146 | £1,180 | £1,216 |
| Text to pay cost (for donations) | £100 | £103 | £106 | £109 | £113 |
| Electricity estimate (including solar panel offsetting - to be updated at later design stage) | £4,500 | £4,635 | £4,774 | £4,917 | £5,065 |
| Water and sewage rates (£0 for charities) | £0 | £0 | £0 | £0 | £0 |
| Waste removal from toilets (annual contract for sanitary waste) | £1,800 | £1,854 | £1,910 | £1,967 | £2,026 |
| Accounts (percentage of overall accounts cost for Garve CORe) | £200 | £206 | £212 | £219 | £225 |
| Insurance for site - (building and public liability) estimate to be updated | £2,000 | £2,060 | £2,122 | £2,185 | £2,251 |
| Consumables - toilet paper, soap | £1,500 | £1,545 | £1,591 | £1,639 | £1,688 |
| Call out / maintenance/repair costs annually | £6,000 | £6,180 | £6,365 | £6,556 | £6,753 |
| Total Estimated annual expenditure | £26,180 | £26,965 | £27,774 | £28,608 | £29,466 |
| Yr1 | Yr2 | Yr3 | Yr4 | Yr5 | |
|---|---|---|---|---|---|
| Profit/Loss | £585 | £1,113 | £1,938 | £1,861 | £1,782 |
| Cashflow | £585 | £1,698 | £3,635 | £5,497 | £7,278 |
Early-stage calculations, based on facilities/services requested by the community and based on the current scale of the masterplan put forward, suggests that income outweighs expenditure.
Next Steps
As previously mentioned, concepts drawn from community consultation, are aimed at engaging the community further on how we now move the project forward. Key to this is giving the whole community the opportunity to make decisions on: -
- Retrofit or New Build
And make comment on: -
- Layout of plans
- Layout of site
To ensure we reach the whole community we plan to: -
- Deliver this document to every household
- Email our members directly
- Make the document available at key community venues – Garve Post Office, Achnasheen Village Hall, Achnasheen Notice Board, Lochluichart Community Hall
- Post on garve.org, which will also go to our Instagram and Twitter Accounts
- Ask community organisations for their support in sharing the document across their own social media platforms and with their own contacts
- Share across ALL WhatsApp Groups that currently receive funding via our Activate Garve and District Project
- Post a reminder in the next issue of The Garve & District News to encourage residents to have their say
We will then arrange community engagement events at key locations available to us acknowledging that Garve Public Hall is currently closed.
Our aim is to also form a steering group of key stakeholders who have a keen interest in supporting the project and moving it forward. Our hope is that the group will include volunteers from residents leaving near the site and anyone else who might wish to be involved in this exciting venture.
The GD CORe Masterplan

Option 1: Retrofit – Proposed Elevations

Option 1: Retrofit – Proposed 3D Views

Option 1: Retrofit – Proposed Floor Plans

Option 2a – New Build – Elevations

Option 2a – New Build 3D Views

Option 2a: New Build – Proposed Floor Plans

Option 1: Retrofit – Sketch Image


Photo by Sue Tarr
Last updated: Tue 17 Mar 2026, 13:28